Skip to content
JBCGeneral BuildingContractor

Bathroom Remodeling

Bathrooms are small rooms with a lot underneath them. Most of the cost, and most of the risk, sits in what you cannot see once it is finished: waterproofing, slope, backing and ventilation. That is the part we do not rush.

Bathroom Remodeling — example of the work

Scope

What the work involves

Tub, shower and pan

Tub-to-shower conversions, replacement pans, curbless entries where the framing allows it. Waterproofing is inspected before any tile goes on.

Tile and stone

Floors, surrounds and niches, set with the layout planned so cuts land where they are least visible.

Vanities, fixtures and lighting

Vanity, top, mirror, trim and lighting selected together, so the finishes match rather than approximately match.

Ventilation and moisture

Extraction sized for the room. An under-ventilated bathroom is what brings mould back two years after a remodel.

Examples

The kind of work we take on

These photographs show the type of bathroom remodeling work described above.

Grey tiled bathroom with a glass walk-in shower and floating vanity
Grey tiled bathroom with a glass walk-in shower and floating vanity
Bathroom with timber-clad walls, wall-hung basin and concealed cistern
Bathroom with timber-clad walls, wall-hung basin and concealed cistern
White metro-tiled bathroom with a black-framed shower screen
White metro-tiled bathroom with a black-framed shower screen
Bathroom feature wall in navy with a round mirror and vessel basin
Bathroom feature wall in navy with a round mirror and vessel basin
Installer setting wall tile in a shower under construction
Installer setting wall tile in a shower under construction
Tradesman removing an old bathtub during a bathroom strip-out
Tradesman removing an old bathtub during a bathroom strip-out

How it works

From first call to final walkthrough

  1. 01

    Talk it through

    Tell us what you want to change. We ask the questions that decide the price before anyone comes out.

  2. 02

    Define the scope

    We measure, check what is behind the walls where we can, and put the work in writing — what is included and what is not.

  3. 03

    Build it

    A scheduled crew, a sequence you can follow, and a clean site at the end of each working day.

  4. 04

    Final walkthrough

    We walk the finished work with you and close out anything on the list before we call it done.

Reviews

What customers said about this work

I'm extremely happy with how my bathroom remodel turned out, the entire process was smooth and professional.
Estefania Laguna · Google review

Questions

Before you call

How long is the bathroom out of service?

It depends on scope and inspection timing. We give you a working range at the estimate and tell you as soon as it changes.

Can you convert a tub to a walk-in shower?

Often yes. The limits are the drain location and the framing, both of which we check on site before quoting.

What if there is water damage behind the wall?

We stop and show you. Hidden damage is priced as a change order with the reason explained — never absorbed silently into the schedule.

Get started

Request an estimate for bathroom remodeling

Tell us the basics and we will call to fill in the details and confirm whether the project is in an area we cover.

Available in Los Angeles, CA · San Diego, CA · Bay Area, CA

Get your free estimate

Four quick questions · about a minute · no obligation

Step 1 of 4

Do you own the home?

Everyone on the title needs to be there for the walkthrough, so it helps to know up front.

Prefer to talk?(310) 708-1466

Call (310) 708-1466Request an Estimate